Skip to main content
All CollectionsCOSHH365™COSHH365™ Other Questions Answered
How do I identify the selected matrix value of a hazard in a risk assessment
How do I identify the selected matrix value of a hazard in a risk assessment
Beth avatar
Written by Beth
Updated over a month ago

When viewing a published assessment, there may be a time when you need to know which value was actually set on a hazard's before or after control risk rating.

For example, lets consider the After Controls value of 8 below:

This value of 8 could be one of two possibilities:

If you need to identify which value was actually chosen, simply load the risk assessment up in the Assessment Wizard, and then click on the Task Hazards & Controls section (Step 4).

Next, locate the hazard icon and the Before/After value that needs to be identified, and then click before or after Set Rating option.

This will load up the risk rating matrix, and the value that has been chosen will be highlighted for you:

Did this answer your question?